SOUTH FLORIDA BASED · WORLDWIDE MARINE SERVICESERVICE ASSISTANTTalk to PELASTRION
INSPECTIONS · TESTING · CERTIFICATION SUPPORT

Ready for the survey.
Clear through closeout.

Annual testing, periodic inspections and ongoing technical readiness. PELASTRION plans the work, addresses equipment issues and organizes the documentation your vessel needs.

Marine electronics technician reviewing navigation equipment with a diagnostic tablet on a vessel bridge
VESSEL-SPECIFIC REQUIREMENTS

The right inspection.
At the right time.

Flag, class, vessel type, tonnage, construction date, operating area and installed equipment determine the requirements. We start with your current certificates, survey status and due dates.

Technical delivery. A clear approval route.

PELASTRION’s corporate approvals are pending. We confirm the task-specific qualifications, service approvals and authorized surveyor or certificate issuer before regulated work. Statutory certificates and endorsements are issued by the flag Administration or an appropriately authorized organization.

View the certification program →
GLOBAL INSPECTION SERVICES

From bridge electronics
to vessel readiness.

Choose a category to explore the technical service and preparation scope. Required approval and attendance arrangements are agreed for each assignment.

20 inspection and support services

Electronics & radio

AIS annual testing

Annual, where SOLAS applies

Performance-test planning, identity and installation checks, functional-test evidence and the onboard report.

Confirm the approved testing route and installed AIS model.

Electronics & radio

VDR & S-VDR annual performance tests

Annual performance test

Recorder and interface review, sensor and recorded-data checks, test documentation and the applicable compliance certificate route.

Testing, report review and certificate issuance must follow the approved manufacturer / service-supplier arrangements.

Electronics & radio

GMDSS & statutory radio surveys

Initial, periodical and renewal stages

Radio installation readiness, communications and reserve-power checks, equipment records and corrective work around the appointed survey.

Survey scope and certificate endorsement depend on the flag, vessel and authorized surveyor.

Electronics & radio

EPIRB annual test & shore maintenance

Annual test · periodic shore maintenance

Plan the annual operational test, coding and registration review, battery and release-unit dates, plus approved shore-based maintenance.

Applicable shore-based maintenance intervals do not exceed five years. Confirm the flag and equipment-specific requirements.

Electronics & radio

SSAS testing & security-system support

Flag / security-plan schedule

Coordinate the authorized test, communications, technical checks and records for the vessel’s ship security alert system.

Test notifications and recipients must follow the ship security plan and flag instructions.

Electronics & radio

LRIT conformance & reporting support

Flag-specific testing requirements

Review the conformance-test report, terminal details and transmission concerns; scope retesting or technical corrective work.

The authorized application service provider and flag determine the test route. Annual testing is not a universal IMO rule.

Electronics & radio

Bridge systems & navigation readiness

Planned, commissioning or defect-driven

Technical checks and records for radar, ECDIS, GNSS, heading, speed/depth inputs, BNWAS and integrated bridge interfaces.

The task and equipment determine the inspection and report; these systems do not all share a universal annual certificate.

Electronics & radio

Electrical & emergency-power checks

Planned maintenance / survey scope

Battery, charging, distribution, emergency-power and connected-system inspection support, with identified defects and agreed test records.

Qualified personnel and approved vessel procedures govern testing and return to service.

Electronics & radio

Flag changes & recommissioning

At vessel or equipment changes

Review affected equipment identity, registration, coding, radio records and technical readiness after a flag/name change or return to service.

Coordinate changes with the relevant authorities and equipment approval process before regulated use.

Electronics & radio

Gyro & magnetic-compass service

Flag / maker / condition-driven

Plan gyro maintenance, heading-system checks or magnetic-compass adjustment, with appropriate records for the installed system.

Flag requirements and qualified adjustment or service arrangements are confirmed for the task.

Electronics & radio

GMDSS reserve-battery capacity

At intervals not exceeding 12 months

Review the capacity-test record, reserve-power arrangements, chargers and battery condition for applicable rechargeable GMDSS reserve batteries.

An appropriate capacity test is performed when the ship is not at sea; the method and results are recorded.

Vessel survey support

Cargo-ship safety survey support

Annual, intermediate / periodical & renewal

Prepare technical evidence and corrective work for safety construction, safety equipment and associated cargo-ship survey stages.

The actual certificate and survey status define the required attendance and authorized issuer.

Vessel survey support

Passenger-ship safety readiness

Normally up to 12-month certification

Coordinate machinery, electrical, radio and safety-system readiness ahead of the appointed passenger-ship safety survey.

Vessel applicability and the exact survey scope are confirmed with the Administration or recognized organization.

Vessel survey support

Load-line survey readiness

Initial, annual & renewal

Address agreed defects and condition records for closures, openings and other relevant arrangements before survey attendance.

Structural survey judgments and certificate endorsement remain with the authorized survey organization.

Vessel survey support

Pollution-prevention survey support

Certificate-specific survey cycles

Equipment readiness and records for oil pollution (IOPP), air pollution (IAPP / relevant engine documentation), sewage (ISPP) and ballast water (IBWMC).

IOPP, IAPP and IBWMC include annual/intermediate stages. ISPP does not have a universal annual survey under HSSC.

Vessel survey support

Flag, class & port-state readiness

Before attendance · after deficiencies

Organize technical records, survey status, reported deficiencies and corrective-work closeout before the relevant authority attends.

PELASTRION supports readiness and remediation; an official inspection or detention decision belongs to the authority.

Safety & lifting

Lifeboats, rescue boats & launching appliances

Applicable annual & five-year work

Scope examination, operational testing, equipment-specific service requirements, corrective work and supporting records.

Required work follows the authorized service-provider and certified-personnel framework for the installed equipment.

Safety & lifting

Cranes, lifting appliances & winches

Rule-specific examination & testing

Plan equipment identification, condition review, load-test requirements, service records and lifting documentation.

New SOLAS II-1/3-13 requirements took effect on 1 January 2026. Applicability and transition dates depend on the appliance and vessel.

Safety & lifting

Fire protection & life-saving equipment

Equipment-specific maintenance intervals

Prepare inspection and servicing scopes for installed fire protection and life-saving systems, with maintenance and test records.

Flag requirements, manufacturer instructions and authorized service arrangements determine intervals and permitted work.

Vessel survey support

ISM, ISPS & MLC technical readiness

Audit / inspection stage as applicable

Organize technical maintenance evidence, outstanding-item records and agreed corrective work, including relevant accommodation and HVAC systems.

Formal management-system, security and labour certification remains with the responsible authorized organization.

ANNUAL · PERIODIC · ONGOING

A plan beyond
the next due date.

Bring inspections, maintenance and vessel movements into one practical support plan. We agree the review schedule and deliverables around your fleet.

01

Establish the baseline

List equipment, certificates, issuer, survey status, last service, due dates and open deficiencies. Identify the records that need confirmation.

02

Plan the attendance

Align survey windows, port calls, qualified attendance, parts, vessel access and the required testing or certificate route.

03

Close and keep current

Record completed work, reports, issuer documents and remaining actions. Revisit the plan after equipment changes, defects or route changes.

Preparing for the 2026 lifting requirements?

Include your appliance register, installation date, safe working load, existing certificates and survey status. We’ll scope the technical work and applicable testing route with you.

Prepare a lifting-equipment brief →
DIGITAL DOCUMENTATION

The report. The certificate.
The verification trail.

Organize service evidence and issuer documents so the right record is available for vessel management and the next inspection.

ServicesStart a conversation